Fluke 1750 Three Phase Power Recorder Datasheet
Page 1
... and reliable configuration: PDA wire- less "front panel interface" provides the ability to verify setup without a laptop along with a window into your installation or distribution system. • Power quality that meets the standard: All measurements comply with the Fluke 1750 Power Recorder. identifying current probes and single-lead voltage connections. • No need...
... and reliable configuration: PDA wire- less "front panel interface" provides the ability to verify setup without a laptop along with a window into your installation or distribution system. • Power quality that meets the standard: All measurements comply with the Fluke 1750 Power Recorder. identifying current probes and single-lead voltage connections. • No need...
Fluke 1750 Three Phase Power Recorder Datasheet
Page 2
Configurations are simple with threshold driven equipment. The Fluke 1750 has an exclusive capture algorithm which makes certain all events are within range - The PDA wirelessly interfaces with the recorder, allowing quick setup and verification with professional reports Quality of service compliance: Validate incoming power quality at the service entrance Equipment Installation/Commissioning: Benchmark...
Configurations are simple with threshold driven equipment. The Fluke 1750 has an exclusive capture algorithm which makes certain all events are within range - The PDA wirelessly interfaces with the recorder, allowing quick setup and verification with professional reports Quality of service compliance: Validate incoming power quality at the service entrance Equipment Installation/Commissioning: Benchmark...
Fluke 1750 Operators Manual
Page 9
... automatically identifies what type of approximately 5 minutes or less. 1 The Recorder then configures its measurement system appropriately for control and setup, and a powerful yet easy to the PDA. 1750 Power Recorder Introduction The Fluke 1750 Power Recorder is a comprehensive yet easy to configure the Recorder, troubleshoot connections, preview data, or download the recorded data...
... automatically identifies what type of approximately 5 minutes or less. 1 The Recorder then configures its measurement system appropriately for control and setup, and a powerful yet easy to the PDA. 1750 Power Recorder Introduction The Fluke 1750 Power Recorder is a comprehensive yet easy to configure the Recorder, troubleshoot connections, preview data, or download the recorded data...
Fluke 1750 Operators Manual
Page 18
... Administrator privileges are required to choose between the phase identifiers A, B, C and L1, L2, L3. This window is also accessed by Menu>1750 Setup>Language. The Language window also provides the option to install applications. • PC with 500 MHz or faster processor. • 256 MB ...8226; Microsoft Excel 2000 or higher WCaution Do not remove the CD until after a hard reset, it directly opens the language setup window. 1750 Operators Manual Language Selection Power View features a localized user interface for Power Analyze • Windows 2000, Windows XP, Windows Vista...
... Administrator privileges are required to choose between the phase identifiers A, B, C and L1, L2, L3. This window is also accessed by Menu>1750 Setup>Language. The Language window also provides the option to install applications. • PC with 500 MHz or faster processor. • 256 MB ...8226; Microsoft Excel 2000 or higher WCaution Do not remove the CD until after a hard reset, it directly opens the language setup window. 1750 Operators Manual Language Selection Power View features a localized user interface for Power Analyze • Windows 2000, Windows XP, Windows Vista...
Fluke 1750 Operators Manual
Page 19
...a recording session. • Interim checkup, mid-recording session At this language. You can register quickly online (preferred) at http://register.fluke.com or you may need to take a few minutes to http://support.microsoft.com. A window appears that appear. Replace x.yy with... the current version number shipped on your new data). Select a language preference for a recording session. • Setup Setup, hookup, and verification of connections and measured signals. Note You may want to the number provided on changing firewall settings, refer to complete...
...a recording session. • Interim checkup, mid-recording session At this language. You can register quickly online (preferred) at http://register.fluke.com or you may need to take a few minutes to http://support.microsoft.com. A window appears that appear. Replace x.yy with... the current version number shipped on your new data). Select a language preference for a recording session. • Setup Setup, hookup, and verification of connections and measured signals. Note You may want to the number provided on changing firewall settings, refer to complete...
Fluke 1750 Operators Manual
Page 20
1750 Operators Manual Installing the Recorder 1. After a minute, or two, all LEDs should flash ON, then OFF, and then each should attach the current probes to the phase wires or busbars before you do anything else. • Connect the power cord to the Recorder using either the Setup Password menu in Power View...
1750 Operators Manual Installing the Recorder 1. After a minute, or two, all LEDs should flash ON, then OFF, and then each should attach the current probes to the phase wires or busbars before you do anything else. • Connect the power cord to the Recorder using either the Setup Password menu in Power View...
Fluke 1750 Operators Manual
Page 34
1750 Operators Manual Navigating in the Recorder and for viewing and analysis on the bottom of the Power View screen allows you to quickly and easily ... the sector of the live data, and transfer data to the Secure Data (SD) card for erasing Recorder internal memory and erasing SD card files. 1750 Setup Brings up the setup screen that allows you can tap the appropriate icon to set recording period information.
1750 Operators Manual Navigating in the Recorder and for viewing and analysis on the bottom of the Power View screen allows you to quickly and easily ... the sector of the live data, and transfer data to the Secure Data (SD) card for erasing Recorder internal memory and erasing SD card files. 1750 Setup Brings up the setup screen that allows you can tap the appropriate icon to set recording period information.
Fluke 1750 Operators Manual
Page 35
... that is replaced with on the Menu Bar and are used to select the voltage and current channels you set the "snapshot period" in the 1750 Setup menu. This icon brings up the Annotate screen. You can be used as voltage and current data can be viewed simultaneously. Annotations can enter multiple...
... that is replaced with on the Menu Bar and are used to select the voltage and current channels you set the "snapshot period" in the 1750 Setup menu. This icon brings up the Annotate screen. You can be used as voltage and current data can be viewed simultaneously. Annotations can enter multiple...
Fluke 1750 Operators Manual
Page 36
... through the Power View application. SD 1750 Password Incorrect Password Tools 1750 Internal Memory 1750 SD Memo 1750 Shutdown... Power View Menu Tree azd15f.eps 28 Erase 1750 Memory Fluke Power View 1750 Power Recorders Found Connecting 1750 Power Recorder Not Found Live Scope Meter Phasor Harmonics Trend Home Menu Tools 1750 Setup Exit 1750 Download Write to SD SD Card...
... through the Power View application. SD 1750 Password Incorrect Password Tools 1750 Internal Memory 1750 SD Memo 1750 Shutdown... Power View Menu Tree azd15f.eps 28 Erase 1750 Memory Fluke Power View 1750 Power Recorders Found Connecting 1750 Power Recorder Not Found Live Scope Meter Phasor Harmonics Trend Home Menu Tools 1750 Setup Exit 1750 Download Write to SD SD Card...
Fluke 1750 Operators Manual
Page 39
... plugged into the Recorder's (not the PDA) SD card slot. You are START and STOP mark annotations inserted during the recording session, or setup parameter changes that change the data significantly, such as the start point. When you want to trim off data that data, you can later...appears. Green and red flags are downloading recorded data from the flash memory to an SD card in the Recorder internal memory. Tap 1750 Internal Memory in the 1750 Setup menu. The default settings of the screen show the start and stop times currently selected for a Recorder is everything in memory. ...
... plugged into the Recorder's (not the PDA) SD card slot. You are START and STOP mark annotations inserted during the recording session, or setup parameter changes that change the data significantly, such as the start point. When you want to trim off data that data, you can later...appears. Green and red flags are downloading recorded data from the flash memory to an SD card in the Recorder internal memory. Tap 1750 Internal Memory in the 1750 Setup menu. The default settings of the screen show the start and stop times currently selected for a Recorder is everything in memory. ...
Fluke 1750 Operators Manual
Page 44
There is used to verify that the correction has been made. You can easily correct an erroneous Recorder connection by going directly to Menu\1750 Setup\Phase Swap ( ) and using the Recorder to internally invert a CT, swap a voltage or CT phase, or modify a scaling parameter, then return to the screen to ... of voltage and current on the PHASOR diagram. You can use the V and A arrows on the upper right of the screen to touch the cables. 1750 Operators Manual Meter Screen The Meter screen shows numeric readings for additional information.
There is used to verify that the correction has been made. You can easily correct an erroneous Recorder connection by going directly to Menu\1750 Setup\Phase Swap ( ) and using the Recorder to internally invert a CT, swap a voltage or CT phase, or modify a scaling parameter, then return to the screen to ... of voltage and current on the PHASOR diagram. You can use the V and A arrows on the upper right of the screen to touch the cables. 1750 Operators Manual Meter Screen The Meter screen shows numeric readings for additional information.
Fluke 1750 Operators Manual
Page 46
Setting Up the Recorder To adjust the settings of the Recorder, tap Menu>1750 Setup. 1750 Operators Manual Viewing Phases In all the detail Live View screen, a line selection menu is available using the button at the bottom. The Phase Selection screen reveals check boxes for selecting the voltage and current channels you want to display. Azd126.bmp Azd127.bmp 38
Setting Up the Recorder To adjust the settings of the Recorder, tap Menu>1750 Setup. 1750 Operators Manual Viewing Phases In all the detail Live View screen, a line selection menu is available using the button at the bottom. The Phase Selection screen reveals check boxes for selecting the voltage and current channels you want to display. Azd126.bmp Azd127.bmp 38
Fluke 1750 Operators Manual
Page 47
The Setup screen shows setup options. Power Recorder Setting Up the Recorder azd140.bmp From the Setup screen, you can adjust either the recording period information or the Recorder settings. Tap an icon on the Setup screen to view or configure: • Clock • Probe Detect • IP Address • Measurement Description • Nominal Power • Phase Swap • Volts/Current Ratio • Recorder Name/Password • Snapshot Period • Language 39
The Setup screen shows setup options. Power Recorder Setting Up the Recorder azd140.bmp From the Setup screen, you can adjust either the recording period information or the Recorder settings. Tap an icon on the Setup screen to view or configure: • Clock • Probe Detect • IP Address • Measurement Description • Nominal Power • Phase Swap • Volts/Current Ratio • Recorder Name/Password • Snapshot Period • Language 39
Fluke 1750 Operators Manual
Page 50
...; Invert any current input clamp The screen shows check boxes to make a software-selectable correction without physically switching the cable. 1750 Operators Manual Configure Nominal Power Values This window contains the setup for Power Config, Nominal Voltage, and Frequency. It is delta, V phases are based on the 3-phase delta icon to correctly...
...; Invert any current input clamp The screen shows check boxes to make a software-selectable correction without physically switching the cable. 1750 Operators Manual Configure Nominal Power Values This window contains the setup for Power Config, Nominal Voltage, and Frequency. It is delta, V phases are based on the 3-phase delta icon to correctly...
Fluke 1750 Operators Manual
Page 54
... These markers only display in the 46 For example, the operator might want to establish a start annotation after having finished all probe connections and instrument setup, to indicate that file will start and open an annotation: • In the Volts/Amps/Hz view, Events view, or Download dialog box, ...click on the view controls. 1750 Operators Manual Azd137.bmp There are inserted by the system when a change is made to show or hide annotation markers: • In the Volts/...
... These markers only display in the 46 For example, the operator might want to establish a start annotation after having finished all probe connections and instrument setup, to indicate that file will start and open an annotation: • In the Volts/Amps/Hz view, Events view, or Download dialog box, ...click on the view controls. 1750 Operators Manual Azd137.bmp There are inserted by the system when a change is made to show or hide annotation markers: • In the Volts/...