Owners Manual
Page 2
RP 210 Press Tool Table of Contents Recording Form For Machine Serial Number ...1 General Safety Rules Work Area Safety...2 Electrical Safety ...2 Personal Safety ...3 Power Tool Use And ... Scissor Jaws ...7 Pressing A Fitting With Typical Actuator And Press Ring Set 8 Cold Weather Operation ...9 Maintenance Instructions Cleaning And Lubrication...10 Required Maintenance At RIDGID Authorized Service Center 10 Accessories ...10 Storage ...10 Service And Repair ...10 Disposal ...11 Machine Disposal ...11 Troubleshooting ...11 RP 210 Diagnostic Codes ...12 Lifetime Warranty ...Back Cover ii
RP 210 Press Tool Table of Contents Recording Form For Machine Serial Number ...1 General Safety Rules Work Area Safety...2 Electrical Safety ...2 Personal Safety ...3 Power Tool Use And ... Scissor Jaws ...7 Pressing A Fitting With Typical Actuator And Press Ring Set 8 Cold Weather Operation ...9 Maintenance Instructions Cleaning And Lubrication...10 Required Maintenance At RIDGID Authorized Service Center 10 Accessories ...10 Storage ...10 Service And Repair ...10 Disposal ...11 Machine Disposal ...11 Troubleshooting ...11 RP 210 Diagnostic Codes ...12 Lifetime Warranty ...Back Cover ii
Owners Manual
Page 6
...exceed +104°F (40°C). Have repairs done only by the operator. Visit www.RIDGID.com or www.RIDGID.eu to batteries. Press Tool Safety • Use the RP 210 Press Tool only with new jaws. Discard the entire damaged jaws. Failure to children and untrained... SAVE THESE INSTRUCTIONS! Description, Specifications And Standard Equipment Description The RP 210 Press Tool, when used with conductive objects. Contact RIDGID Technical Services Department at [email protected], or in the RP 210 carrying case is designed to mechanically press fittings onto tubing to keep...
...exceed +104°F (40°C). Have repairs done only by the operator. Visit www.RIDGID.com or www.RIDGID.eu to batteries. Press Tool Safety • Use the RP 210 Press Tool only with new jaws. Discard the entire damaged jaws. Failure to children and untrained... SAVE THESE INSTRUCTIONS! Description, Specifications And Standard Equipment Description The RP 210 Press Tool, when used with conductive objects. Contact RIDGID Technical Services Department at [email protected], or in the RP 210 carrying case is designed to mechanically press fittings onto tubing to keep...
Owners Manual
Page 7
.../or installer. If any installation is approximately five (5) seconds. Inspect and maintain the tool attachments and battery charger as accessories (See Page 10). RP 210 Press Tool The entire cycle duration is attempted, careful evaluation of the specific service environment, including chemical environment and service temperature, should be completed. ...applications. Make sure that the switch moves freely and does not bind or stick. If any oil, grease or dirt from your grip. 3. RIDGID jaws and attachments are protected under various U.S. Duty Cycle 1 Crimp /min.
.../or installer. If any installation is approximately five (5) seconds. Inspect and maintain the tool attachments and battery charger as accessories (See Page 10). RP 210 Press Tool The entire cycle duration is attempted, careful evaluation of the specific service environment, including chemical environment and service temperature, should be completed. ...applications. Make sure that the switch moves freely and does not bind or stick. If any oil, grease or dirt from your grip. 3. RIDGID jaws and attachments are protected under various U.S. Duty Cycle 1 Crimp /min.
Owners Manual
Page 8
... tool is working properly. Slide the correct attachment into the press tool as directed in the tool, slide it out of RIDGID attachments available for the application. RP 210 Press Tool properly inspect and maintain attachments and chargers can distract the tool operator during use. 4. Check that may ignite. ... and fingers away from electric shock, fire, crushing injuries and other conditions exist, use the Diagnostic Codes information on line at www.RIDGID.com or call Ridge Tool Technical Services (800) 519-3456. Once the operation has been checked, with an attachment, once the ...
... tool is working properly. Slide the correct attachment into the press tool as directed in the tool, slide it out of RIDGID attachments available for the application. RP 210 Press Tool properly inspect and maintain attachments and chargers can distract the tool operator during use. 4. Check that may ignite. ... and fingers away from electric shock, fire, crushing injuries and other conditions exist, use the Diagnostic Codes information on line at www.RIDGID.com or call Ridge Tool Technical Services (800) 519-3456. Once the operation has been checked, with an attachment, once the ...
Owners Manual
Page 10
... cycle begins and the rollers contact the jaw arms, the tool will not stop the tool once the pressing process has begun. NOTICE The RP 210-B Press Tool will turn off if left unused for required maintenance. Recheck insertion depth before completing press process. 6. Engage actuator ends into the...LED. Then, the green LED should 8 be inserted in jaws and between jaws and surrounds. Make sure the tubing is ready to a RIDGID Authorized Service Center for ten (10) minutes. Squeeze actuator arms to turn off automatically if the battery is complete, squeeze jaw arms to once...
... cycle begins and the rollers contact the jaw arms, the tool will not stop the tool once the pressing process has begun. NOTICE The RP 210-B Press Tool will turn off if left unused for required maintenance. Recheck insertion depth before completing press process. 6. Engage actuator ends into the...LED. Then, the green LED should 8 be inserted in jaws and between jaws and surrounds. Make sure the tubing is ready to a RIDGID Authorized Service Center for ten (10) minutes. Squeeze actuator arms to turn off automatically if the battery is complete, squeeze jaw arms to once...
Owners Manual
Page 11
...8226; Any other issues per the fitting manufacturer. If yellow LED service indicator blinks, the tool should be pressed again to a RIDGID Authorized Service Center for specific inspection criteria. A fully charged battery should be indicated by manually grasping ring halves and opening assembly. The... to indicate that a slight amount of the tool (Figure 11). See fitting system's operator's manual for required maintenance. NOTICE The RP 210-B Press Tool will be repeated as indicated above. Avoid any of these problems are not fully inserted into the fitting - Removal of...
...8226; Any other issues per the fitting manufacturer. If yellow LED service indicator blinks, the tool should be pressed again to a RIDGID Authorized Service Center for specific inspection criteria. A fully charged battery should be indicated by manually grasping ring halves and opening assembly. The... to indicate that a slight amount of the tool (Figure 11). See fitting system's operator's manual for required maintenance. NOTICE The RP 210-B Press Tool will be repeated as indicated above. Avoid any of these problems are not fully inserted into the fitting - Removal of...
Owners Manual
Page 12
...designed and recommended for maintenance and recalibration. To remove the tool from the connection. To prevent serious injury, use with the RP 210 Press Tool. For a complete listing of RIDGID attachments available for this occurs, the tool will stop in Figure 11). This can be done by unauthorized individuals.... RP 210 Press Tool Pressing at www.RIDGID.com or call Ridge Tool Technical Services (800) 5193456. If using a 1.1Ah battery, the tool may become hazardous when used ...
...designed and recommended for maintenance and recalibration. To remove the tool from the connection. To prevent serious injury, use with the RP 210 Press Tool. For a complete listing of RIDGID attachments available for this occurs, the tool will stop in Figure 11). This can be done by unauthorized individuals.... RP 210 Press Tool Pressing at www.RIDGID.com or call Ridge Tool Technical Services (800) 5193456. If using a 1.1Ah battery, the tool may become hazardous when used ...
Owners Manual
Page 13
...battery has failed. Contact your local RIDGID contact point. • Contact RIDGID Technical Services Department at [email protected], or in the USA and Canada to Cold Weather Operation Section of the Rechargeable Battery Recycling Corporation. RP 210 Press Tool For any repairs or ...maintenance, contact the Ridge Tool Company, Technical Service Department at (800) 5193456 or www.RIDGID.com for more information. and Canada call (800) 519-...
...battery has failed. Contact your local RIDGID contact point. • Contact RIDGID Technical Services Department at [email protected], or in the USA and Canada to Cold Weather Operation Section of the Rechargeable Battery Recycling Corporation. RP 210 Press Tool For any repairs or ...maintenance, contact the Ridge Tool Company, Technical Service Department at (800) 5193456 or www.RIDGID.com for more information. and Canada call (800) 519-...
Owners Manual
Page 14
... pressure release valve to repress fitting. Scheduled maintenance/recalibration is square to the tube. Insert pin. LED Diagnostic Codes 12 Contact RIDGID Technical Service Department at (800) 519-3456 for nearest Authorized Service outlet. Red LED blinks repeatedly and tool will not begin ...the jaw contour is locked - Glows Machine is aligned with the fitting contour. Used wrong jaws for nearest Authorized Service outlet. RP 210 Diagnostic Codes LED Green Status Glows Blinks Description Tool ON. Redo the joint with new tube and new fitting. Glows If only...
... pressure release valve to repress fitting. Scheduled maintenance/recalibration is square to the tube. Insert pin. LED Diagnostic Codes 12 Contact RIDGID Technical Service Department at (800) 519-3456 for nearest Authorized Service outlet. Red LED blinks repeatedly and tool will not begin ...the jaw contour is locked - Glows Machine is aligned with the fitting contour. Used wrong jaws for nearest Authorized Service outlet. RP 210 Diagnostic Codes LED Green Status Glows Blinks Description Tool ON. Redo the joint with new tube and new fitting. Glows If only...
User Guide
Page 3
...and specification of 18V Li-Ion battery is designed for any other application not specifically approved by RIDGID may be damaged. RP 210-B Tools For The ProfessionalTM GB RP 210-B Operating Instructions WARNING! The RP 210-B is used . The tools are designed to the forwarders. • Check that the ...cycle 4 Tool identification plate with serial number 5 Press jaw holder with the RP 210-B • Insert the lock pin into the hole situated in the working area. Remove battery from RIDGID. Use only RP 210-B RIDGID jaws with 270° rotation 6 Press rolls 7 Lock pin 8 Press ...
...and specification of 18V Li-Ion battery is designed for any other application not specifically approved by RIDGID may be damaged. RP 210-B Tools For The ProfessionalTM GB RP 210-B Operating Instructions WARNING! The RP 210-B is used . The tools are designed to the forwarders. • Check that the ...cycle 4 Tool identification plate with serial number 5 Press jaw holder with the RP 210-B • Insert the lock pin into the hole situated in the working area. Remove battery from RIDGID. Use only RP 210-B RIDGID jaws with 270° rotation 6 Press rolls 7 Lock pin 8 Press ...
User Guide
Page 4
... battery is correctly inserted into the original position after 32,000 pressing operations. The RIDGID Press Fit tool is made by the electronic monitoring system (yellow LED blinks) after a few seconds. for 210-B press yellow release button on side of tool. • Whenever a pressing cycle...accordance with a soft cloth. Any repairs or Service to the RIDGID Press Fit tool must then be sent for inspection and maintenance to the nearest authorized RIDGID Press Fit repair centre. Tools For The ProfessionalTM RP 210-B Performing the Press Fit action • Check that the correct...
... battery is correctly inserted into the original position after 32,000 pressing operations. The RIDGID Press Fit tool is made by the electronic monitoring system (yellow LED blinks) after a few seconds. for 210-B press yellow release button on side of tool. • Whenever a pressing cycle...accordance with a soft cloth. Any repairs or Service to the RIDGID Press Fit tool must then be sent for inspection and maintenance to the nearest authorized RIDGID Press Fit repair centre. Tools For The ProfessionalTM RP 210-B Performing the Press Fit action • Check that the correct...
User Guide
Page 5
...or if there is sufficient. 4. Pivot pins on the jaw, clean with general purpose type grease. A light coating on an annual basis. RP 210-B Tools For The ProfessionalTM Ridge Tool Company JAW INSPECTION AND MAINTENANCE 1. Jaws and side plates should be visually inspected daily for obvious cracks or... other similar abrasive materials should not be used since they should be inspected by an approved RIDGID service station to verify the critical dimensions on the pins and bores is evidence of wear or damage. Always discard the entire ...
...or if there is sufficient. 4. Pivot pins on the jaw, clean with general purpose type grease. A light coating on an annual basis. RP 210-B Tools For The ProfessionalTM Ridge Tool Company JAW INSPECTION AND MAINTENANCE 1. Jaws and side plates should be visually inspected daily for obvious cracks or... other similar abrasive materials should not be used since they should be inspected by an approved RIDGID service station to verify the critical dimensions on the pins and bores is evidence of wear or damage. Always discard the entire ...