Installation Guide
Page 29
...CSCs) and switch fabric cards (SFCs). The Cisco 12012 is a member of the Cisco 12000 series of the frame. The Cisco 12012 is built around a high-speed switching fabric that is keyed; Network interfaces reside on line cards that support a combination of AC- The lower card cage is scalable from 5 to 60... physical descriptions of the router hardware and major components, and functional descriptions of the Cisco 12012 Gigabit Switch Router (GSR). The rightmost slot in a power supply bay located near the bottom of gigabit switch routers. Note The Cisco 12012 does not support a ...
...CSCs) and switch fabric cards (SFCs). The Cisco 12012 is a member of the Cisco 12000 series of the frame. The Cisco 12012 is built around a high-speed switching fabric that is keyed; Network interfaces reside on line cards that support a combination of AC- The lower card cage is scalable from 5 to 60... physical descriptions of the router hardware and major components, and functional descriptions of the Cisco 12012 Gigabit Switch Router (GSR). The rightmost slot in a power supply bay located near the bottom of gigabit switch routers. Note The Cisco 12012 does not support a ...
Installation Guide
Page 31
Physical and Functional Overviews Figure 1-1 Cisco 12012 (Front View, AC-Input Power Supplies Shown) Top blower module (behind front cover) Frame 0 ACTIVCEARRRIXERPKT EJECT SSLLOOTT--01 RESET AUX 1 ACTIVCEARRRIXERCELL 0 ACTIVCEARRRIXERCELL 0 CRITICALMAJORMINOR ACTIVCEARRRIXERPKT 2 CONSOLE ... 2000 W ~ INPUT: 200 -240V 10 A 50/60 HZ 2000 W ~ INPUT: 200 -240V 10 A 50/60 HZ 2000 W ~ INPUT: 200 -240V 10 A 50/60 HZ 2000 W AC OK OUTPUT FAIL AC OK OUTPUT FAIL AC OK OUTPUT FAIL AC OK OUTPUT FAIL SFC 12 ALARM CSC 10 FAIL ENABLED 0 ALARM 2 Lower card cage (behind air...
Physical and Functional Overviews Figure 1-1 Cisco 12012 (Front View, AC-Input Power Supplies Shown) Top blower module (behind front cover) Frame 0 ACTIVCEARRRIXERPKT EJECT SSLLOOTT--01 RESET AUX 1 ACTIVCEARRRIXERCELL 0 ACTIVCEARRRIXERCELL 0 CRITICALMAJORMINOR ACTIVCEARRRIXERPKT 2 CONSOLE ... 2000 W ~ INPUT: 200 -240V 10 A 50/60 HZ 2000 W ~ INPUT: 200 -240V 10 A 50/60 HZ 2000 W ~ INPUT: 200 -240V 10 A 50/60 HZ 2000 W AC OK OUTPUT FAIL AC OK OUTPUT FAIL AC OK OUTPUT FAIL AC OK OUTPUT FAIL SFC 12 ALARM CSC 10 FAIL ENABLED 0 ALARM 2 Lower card cage (behind air...
Installation Guide
Page 53
...in the five slots in the lower card cage. (See Figure 1-7.) A clock and scheduler card is 2 amps, 50 volt-amp. • CSC/SFC LEDs-Five pairs of the Cisco 12012 is installed in slot 2, slot 3, or slot 4 (SFC 1, SFC 2, or SFC 3) in that slot has been detected by the system.... Figure 1-6 Alarm Card Faceplate LEDs, Switches, and Connectors Critical, major, and minor alarm LEDs Pin 1 CSC SFC FAIL ENABLED 0 1 0 1 2 Pin 1 H10900 ...
...in the five slots in the lower card cage. (See Figure 1-7.) A clock and scheduler card is 2 amps, 50 volt-amp. • CSC/SFC LEDs-Five pairs of the Cisco 12012 is installed in slot 2, slot 3, or slot 4 (SFC 1, SFC 2, or SFC 3) in that slot has been detected by the system.... Figure 1-6 Alarm Card Faceplate LEDs, Switches, and Connectors Critical, major, and minor alarm LEDs Pin 1 CSC SFC FAIL ENABLED 0 1 0 1 2 Pin 1 H10900 ...
Installation Guide
Page 54
You can add switching capacity (up to 60 Gbps) and redundancy by increasing the number of switch cards (to operate. Both types of cards have a one clock and scheduler card installed to a maximum ... Card Cage FAIL ENABLED 0 OC-12/STM-4 POS OC-12/STM-4 ATM Q OC-3/STM-POS GIGABIT ROUTE PROCESSOR CSC 10 SFC 12 ALARM Lower card cage slot 0 Lower card cage slot 4 H11017 1-26 Cisco 12012 Gigabit Switch Router Installation and Configuration Guide Physical and Functional Overviews A system must have a switching capacity of 15 Gbps.
You can add switching capacity (up to 60 Gbps) and redundancy by increasing the number of switch cards (to operate. Both types of cards have a one clock and scheduler card installed to a maximum ... Card Cage FAIL ENABLED 0 OC-12/STM-4 POS OC-12/STM-4 ATM Q OC-3/STM-POS GIGABIT ROUTE PROCESSOR CSC 10 SFC 12 ALARM Lower card cage slot 0 Lower card cage slot 4 H11017 1-26 Cisco 12012 Gigabit Switch Router Installation and Configuration Guide Physical and Functional Overviews A system must have a switching capacity of 15 Gbps.
Installation Guide
Page 56
...width DC-input power supplies. Status of the cards in the configuration notes Cisco 12012 Gigabit Switch Router AC-Input Power Supply Replacement Instructions (Document Number 78-4334-xx) and Cisco 12012 Gigabit Switch Router DC-Input power Supply Replacement Instructions (Document Number 78-4330-xx). Power ...Supplies The power supply bay, located at the bottom of LEDs includes a green enable LED, which indicates the clock and scheduler card (CSC) or switch fabric ...
...width DC-input power supplies. Status of the cards in the configuration notes Cisco 12012 Gigabit Switch Router AC-Input Power Supply Replacement Instructions (Document Number 78-4334-xx) and Cisco 12012 Gigabit Switch Router DC-Input power Supply Replacement Instructions (Document Number 78-4330-xx). Power ...Supplies The power supply bay, located at the bottom of LEDs includes a green enable LED, which indicates the clock and scheduler card (CSC) or switch fabric ...
Installation Guide
Page 66
H10733 CRITICALMAJORMINOR ALARM 1 ACO/LT ALARM 2 FAIL ENABLED 0 CSC 10 SFC 12 ALARM 1-38 Cisco 12012 Gigabit Switch Router Installation and Configuration Guide Line card Captive screw Vertical cable-management bracket Physical and Functional Overviews Figure 1-13 Cable-Management System Horizontal cable-management tray ...
H10733 CRITICALMAJORMINOR ALARM 1 ACO/LT ALARM 2 FAIL ENABLED 0 CSC 10 SFC 12 ALARM 1-38 Cisco 12012 Gigabit Switch Router Installation and Configuration Guide Line card Captive screw Vertical cable-management bracket Physical and Functional Overviews Figure 1-13 Cable-Management System Horizontal cable-management tray ...
Installation Guide
Page 101
... H10654 RJ-45 MII ALARM 2 FAIL ENABLED 0 OC-12/STM-4 POS OC-12/STM-4 ATM Q OC-3/STM-POS ROUTE PROCESSOR CSC 10 SFC 12 ALARM Installing a Cisco 12012 3-5 Perform the following steps to remove a blower module: Step 1 Attach an antistatic wrist strap to yourself and to one of the...and pull it straight out to the card cage assembly. Step 2 Grasp both edges of each . Removing the Cisco 12012 Components before Installing the Frame Removing the Blower Modules The Cisco 12012 has two blower modules, which provide cooling air to detach the front cover from the blower module faceplate. (...
... H10654 RJ-45 MII ALARM 2 FAIL ENABLED 0 OC-12/STM-4 POS OC-12/STM-4 ATM Q OC-3/STM-POS ROUTE PROCESSOR CSC 10 SFC 12 ALARM Installing a Cisco 12012 3-5 Perform the following steps to remove a blower module: Step 1 Attach an antistatic wrist strap to yourself and to one of the...and pull it straight out to the card cage assembly. Step 2 Grasp both edges of each . Removing the Cisco 12012 Components before Installing the Frame Removing the Blower Modules The Cisco 12012 has two blower modules, which provide cooling air to detach the front cover from the blower module faceplate. (...
Installation Guide
Page 102
... the blower module halfway out of the frame. Step 5 Place your free hand underneath the blower module for the second blower module. 3-6 Cisco 12012 Gigabit Switch Router Installation and Configuration Guide Repeat Step 2 through Step 5 for support and slide the blower module completely out of the frame. Removing the... RX LINK TX H10655 RJ-45 MII ALARM 2 FAIL ENABLED 0 OC-12/STM-4 POS OC-12/STM-4 ATM Q OC-3/STM-POS ROUTE PROCESSOR CSC 10 SFC 12 ALARM Caution The blower module weighs 22 lb (10 kg). Set the blower module aside. Use two hands when handling a blower module...
... the blower module halfway out of the frame. Step 5 Place your free hand underneath the blower module for the second blower module. 3-6 Cisco 12012 Gigabit Switch Router Installation and Configuration Guide Repeat Step 2 through Step 5 for support and slide the blower module completely out of the frame. Removing the... RX LINK TX H10655 RJ-45 MII ALARM 2 FAIL ENABLED 0 OC-12/STM-4 POS OC-12/STM-4 ATM Q OC-3/STM-POS ROUTE PROCESSOR CSC 10 SFC 12 ALARM Caution The blower module weighs 22 lb (10 kg). Set the blower module aside. Use two hands when handling a blower module...
Installation Guide
Page 103
Figure 3-4 Cisco 12012 Card Cage Assembly 0 ACTIVCEARRRIXERPKT EJECT SSLLOOTT--01 RESET AUX 1 ACTIVCEARRRIXERCELL 0 ACTIVCEARRRIXERCELL 0 CRITICALMAJORMINOR ACTIVCEARRRIXERPKT... A 50/60 HZ 2000 W ~ INPUT: 200 -240V 10 A 50/60 HZ 2000 W AC OK OUTPUT FAIL AC OK OUTPUT FAIL AC OK OUTPUT FAIL AC OK OUTPUT FAIL SFC 12 ALARM CSC 10 FAIL ENABLED 0 ALARM 2 Card cage assembly H10662 Installing a Cisco 12012 3-7 The..., you must remove the cards installed in it. Removing the Cisco 12012 Components before Installing the Frame Removing Cards from the upper and lower card cages.
Figure 3-4 Cisco 12012 Card Cage Assembly 0 ACTIVCEARRRIXERPKT EJECT SSLLOOTT--01 RESET AUX 1 ACTIVCEARRRIXERCELL 0 ACTIVCEARRRIXERCELL 0 CRITICALMAJORMINOR ACTIVCEARRRIXERPKT... A 50/60 HZ 2000 W ~ INPUT: 200 -240V 10 A 50/60 HZ 2000 W AC OK OUTPUT FAIL AC OK OUTPUT FAIL AC OK OUTPUT FAIL AC OK OUTPUT FAIL SFC 12 ALARM CSC 10 FAIL ENABLED 0 ALARM 2 Card cage assembly H10662 Installing a Cisco 12012 3-7 The..., you must remove the cards installed in it. Removing the Cisco 12012 Components before Installing the Frame Removing Cards from the upper and lower card cages.
Installation Guide
Page 105
... 2 CONSOLE EJECT ALARM 1 ACO/LT ACTIVCEARRRIXERPKT SSLLOOTT--01 RESET AUX 3 ACTIVCEARRRIXERPKT COLL RX LINK TX CONSOLE RJ-45 MII ALARM 2 FAIL ENABLED 0 CSC 10 OC-12/STM-4 POS OC-12/STM-4 ATM Q OC-3/STM-POS GIGABIT ROUTE PROCESSOR COLL RX LINK TX SFC 12 ALARM RJ-45 MII...rest of the slot and place it . (See Figure 3-5c.) Slide the card out of the cards in the upper card cage. Installing a Cisco 12012 3-9 Removing the Cisco 12012 Components before Installing the Frame Step 3 Step 4 Step 5 Starting from slot 0 (left side of the upper card cage), select a card and...
... 2 CONSOLE EJECT ALARM 1 ACO/LT ACTIVCEARRRIXERPKT SSLLOOTT--01 RESET AUX 3 ACTIVCEARRRIXERPKT COLL RX LINK TX CONSOLE RJ-45 MII ALARM 2 FAIL ENABLED 0 CSC 10 OC-12/STM-4 POS OC-12/STM-4 ATM Q OC-3/STM-POS GIGABIT ROUTE PROCESSOR COLL RX LINK TX SFC 12 ALARM RJ-45 MII...rest of the slot and place it . (See Figure 3-5c.) Slide the card out of the cards in the upper card cage. Installing a Cisco 12012 3-9 Removing the Cisco 12012 Components before Installing the Frame Step 3 Step 4 Step 5 Starting from slot 0 (left side of the upper card cage), select a card and...
Installation Guide
Page 107
Removing the Cisco 12012 Components before Installing the Frame Figure 3-6 Opening the Air Filter Tray FAIL ENABLED 0 OC-12/STM-4 POS OC-12/STM-4 ATM Q OC-3/STM-POS GIGABIT ROUTE PROCESSOR CSC 10 SFC 12 ALARM Air deflector Honeycomb screen H10472 Captive Air ...filter screw tray Air filter Captive screw Caution To prevent damage, do not place any tools on the air filter tray or in the lower card cage could restrict the air flow causing an overtemperature condition in the Cisco 12012. Installing a Cisco 12012...
Removing the Cisco 12012 Components before Installing the Frame Figure 3-6 Opening the Air Filter Tray FAIL ENABLED 0 OC-12/STM-4 POS OC-12/STM-4 ATM Q OC-3/STM-POS GIGABIT ROUTE PROCESSOR CSC 10 SFC 12 ALARM Air deflector Honeycomb screen H10472 Captive Air ...filter screw tray Air filter Captive screw Caution To prevent damage, do not place any tools on the air filter tray or in the lower card cage could restrict the air flow causing an overtemperature condition in the Cisco 12012. Installing a Cisco 12012...
Installation Guide
Page 108
Removing the Cisco 12012 Components before Installing the Frame Step 3 To access the cards in the lower card cage, you must first move the air deflector up and secure ... Card Cage Air Deflector Air deflector latch Air deflector FAIL ENABLED 0 OC-12/STM-4 POS OC-12/STM-4 ATM Q OC-3/STM-POS GIGABIT ROUTE PROCESSOR CSC 10 SFC 12 ALARM H10473 Air filter tray 3-12 Cisco 12012 Gigabit Switch Router Installation and Configuration Guide
Removing the Cisco 12012 Components before Installing the Frame Step 3 To access the cards in the lower card cage, you must first move the air deflector up and secure ... Card Cage Air Deflector Air deflector latch Air deflector FAIL ENABLED 0 OC-12/STM-4 POS OC-12/STM-4 ATM Q OC-3/STM-POS GIGABIT ROUTE PROCESSOR CSC 10 SFC 12 ALARM H10473 Air filter tray 3-12 Cisco 12012 Gigabit Switch Router Installation and Configuration Guide
Installation Guide
Page 109
Grasp the two card ejector levers and simultaneously pivot both ejector levers 90 degrees away from the sides of the cards in the lower card cage. Removing the Cisco 12012 Components before Installing the Frame Step 4 Select one of the card cage to unseat the card from the backplane connector. (See Figure 3-8.) Figure 3-8 Removing Cards from the Lower Card Cage Card ejector lever Card ejector lever FAIL ENABLED 0 OC-12/STM-4 POS OC-12/STM-4 ATM Q OC-3/STM-POS GIGABIT ROUTE PROCESSOR CSC 10 SFC 12 ALARM Lower card cage Switch fabric card H10474 Installing a Cisco 12012 3-13
Grasp the two card ejector levers and simultaneously pivot both ejector levers 90 degrees away from the sides of the cards in the lower card cage. Removing the Cisco 12012 Components before Installing the Frame Step 4 Select one of the card cage to unseat the card from the backplane connector. (See Figure 3-8.) Figure 3-8 Removing Cards from the Lower Card Cage Card ejector lever Card ejector lever FAIL ENABLED 0 OC-12/STM-4 POS OC-12/STM-4 ATM Q OC-3/STM-POS GIGABIT ROUTE PROCESSOR CSC 10 SFC 12 ALARM Lower card cage Switch fabric card H10474 Installing a Cisco 12012 3-13
Installation Guide
Page 144
... alarm card faceplate. Critical, major, and minor alarms generated in the Cisco 12012 system are accessible through the two alarm card connectors. 3-48 Cisco 12012 Gigabit Switch Router Installation and Configuration Guide The generated alarms also control alarm relays mounted on... the alarm card faceplate. (See Figure 3-23.) Figure 3-23 Alarm Card Connectors Critical, major, and minor alarm LEDs Pin 1 CSC SFC FAIL ENABLED 0 ...
... alarm card faceplate. Critical, major, and minor alarms generated in the Cisco 12012 system are accessible through the two alarm card connectors. 3-48 Cisco 12012 Gigabit Switch Router Installation and Configuration Guide The generated alarms also control alarm relays mounted on... the alarm card faceplate. (See Figure 3-23.) Figure 3-23 Alarm Card Connectors Critical, major, and minor alarm LEDs Pin 1 CSC SFC FAIL ENABLED 0 ...
Installation Guide
Page 147
... the following steps to attach the grounding lugs to the grounding receptacles on your Cisco 12012: Step 1 Locate the grounding receptacles on your Cisco 12012. (See Figure 3-24.) Figure 3-24 System Grounding Receptacles H10899 CRITICALMAJORMINOR ALARM 1 ACO/LT ALARM 2 FAIL ENABLED 0 CSC 10 SFC 12 ALARM System grounding receptacles ACTIVCEARRRIXERCELL 0 ACTIVCEARRRIXERCELL 0 ACTIVCEARRRIXERPKT ACTIVCEARRRIXERPKT ACTIVCEARRRIXERPKT ACTIVCEARRRIXERPKT...
... the following steps to attach the grounding lugs to the grounding receptacles on your Cisco 12012: Step 1 Locate the grounding receptacles on your Cisco 12012. (See Figure 3-24.) Figure 3-24 System Grounding Receptacles H10899 CRITICALMAJORMINOR ALARM 1 ACO/LT ALARM 2 FAIL ENABLED 0 CSC 10 SFC 12 ALARM System grounding receptacles ACTIVCEARRRIXERCELL 0 ACTIVCEARRRIXERCELL 0 ACTIVCEARRRIXERPKT ACTIVCEARRRIXERPKT ACTIVCEARRRIXERPKT ACTIVCEARRRIXERPKT...
Installation Guide
Page 216
...messages, which in turn, determines how the MBus module will function. • The clock and scheduler card (CSC), containing the system clock, immediately powers up. • The MBus module on the card to a card...startup, the environmental monitoring functions are turned on its DC-DC converter powering up . When the CSC has powered up the router for the first time, you start up , the MBus module on the RP turns on , ... the clock and scheduler card power up the RP. 5-4 Cisco 12012 Gigabit Switch Router Installation and Configuration Guide This section contains a description of the...
...messages, which in turn, determines how the MBus module will function. • The clock and scheduler card (CSC), containing the system clock, immediately powers up. • The MBus module on the card to a card...startup, the environmental monitoring functions are turned on its DC-DC converter powering up . When the CSC has powered up the router for the first time, you start up , the MBus module on the RP turns on , ... the clock and scheduler card power up the RP. 5-4 Cisco 12012 Gigabit Switch Router Installation and Configuration Guide This section contains a description of the...
Installation Guide
Page 232
... traffic normally. When testing is not recommended for the tests on the clock and scheduler cards (CSCs) and the switch fabric cards (SFCs), which may temporarily drop throughput on the card being tested. 6-2 Cisco 12012 Gigabit Switch Router Installation and Configuration Guide It takes about 1-minute to obtain test results from the mbus. Diagnostic...
... traffic normally. When testing is not recommended for the tests on the clock and scheduler cards (CSCs) and the switch fabric cards (SFCs), which may temporarily drop throughput on the card being tested. 6-2 Cisco 12012 Gigabit Switch Router Installation and Configuration Guide It takes about 1-minute to obtain test results from the mbus. Diagnostic...
Installation Guide
Page 244
... the lower card cage could restrict the airflow causing an overtemperature condition in the router. 7-4 Cisco 12012 Gigabit Switch Router Installation and Configuration Guide Connecting an ESD-Preventive Strap to the Cisco 12012 OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO 46596 CRITICALMAJORMINOR ALARM 1 ACO/LT ALARM 2 FAIL ENABLED 0 CSC 10 SFC 12 ALARM ESD connection socket Figure 7-1 Cleaning and Replacing the Air Filter...
... the lower card cage could restrict the airflow causing an overtemperature condition in the router. 7-4 Cisco 12012 Gigabit Switch Router Installation and Configuration Guide Connecting an ESD-Preventive Strap to the Cisco 12012 OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO 46596 CRITICALMAJORMINOR ALARM 1 ACO/LT ALARM 2 FAIL ENABLED 0 CSC 10 SFC 12 ALARM ESD connection socket Figure 7-1 Cleaning and Replacing the Air Filter...
Installation Guide
Page 246
... Q OC-3/STM-POS GIGABIT ROUTE PROCESSOR CSC 10 SFC 12 ALARM Air filter Captive screw Air filter tray ~ INPUT: 200 -240V 10 A 50/60 HZ 2000 W ~ INPUT: 200 -240V 10 A 50/60 HZ 2000 W ~ INPUT: 200 -240V 10 A 50/60 HZ 2000 W ~ INPUT: 200 -240V 10 A 50/60 HZ 2000 W 46034 AC OK AC OK... filter appears worn or is torn, you can vacuum it . For instructions on replacing the air filter assembly, see "Cleaning the Air Filter" on page 7. 7-6 Cisco 12012 Gigabit Switch Router Installation and Configuration Guide
... Q OC-3/STM-POS GIGABIT ROUTE PROCESSOR CSC 10 SFC 12 ALARM Air filter Captive screw Air filter tray ~ INPUT: 200 -240V 10 A 50/60 HZ 2000 W ~ INPUT: 200 -240V 10 A 50/60 HZ 2000 W ~ INPUT: 200 -240V 10 A 50/60 HZ 2000 W ~ INPUT: 200 -240V 10 A 50/60 HZ 2000 W 46034 AC OK AC OK... filter appears worn or is torn, you can vacuum it . For instructions on replacing the air filter assembly, see "Cleaning the Air Filter" on page 7. 7-6 Cisco 12012 Gigabit Switch Router Installation and Configuration Guide
Installation Guide
Page 251
... New Air Filter in the New Air Filter Tray FAIL ENABLED 0 OC-12/STM-4 POS OC-12/STM-4 ATM Q OC-3/STM-POS GIGABIT ROUTE PROCESSOR CSC 10 SFC 12 ALARM 46031 Step 8 Raise the new air filter tray until it touches the chassis. Step 10 After tightening both captive screws with...-blade screwdriver, give each screw an additional one hand apply pressure to the top of the new air filter tray against the chassis. Maintaining the Cisco 12012 7-11 Step 9 With one quarter turn to ensure a good seal of the new air filter tray.
... New Air Filter in the New Air Filter Tray FAIL ENABLED 0 OC-12/STM-4 POS OC-12/STM-4 ATM Q OC-3/STM-POS GIGABIT ROUTE PROCESSOR CSC 10 SFC 12 ALARM 46031 Step 8 Raise the new air filter tray until it touches the chassis. Step 10 After tightening both captive screws with...-blade screwdriver, give each screw an additional one hand apply pressure to the top of the new air filter tray against the chassis. Maintaining the Cisco 12012 7-11 Step 9 With one quarter turn to ensure a good seal of the new air filter tray.