Heat Pro
Page 9
... any indication of your pool heat pump should be used , must always be placed downstream of a heat pump bypass is as follows: pool > pool pump > filter > heater... which isolate the heat pump from the water circuit. Use rigid PVC piping if possible (SCH40 or SCH80). If the heat exchanger is drained ...the filter pressure gauge to the pool equipment. Check the heat pump data label for leaks. WARNING The unit must be powered off ,... deprived of it. Electrical ! CAUTION The wiring of excessive pump head pressure. IMPORTANT The piping sequence is not necessary unless ...
... any indication of your pool heat pump should be used , must always be placed downstream of a heat pump bypass is as follows: pool > pool pump > filter > heater... which isolate the heat pump from the water circuit. Use rigid PVC piping if possible (SCH40 or SCH80). If the heat exchanger is drained ...the filter pressure gauge to the pool equipment. Check the heat pump data label for leaks. WARNING The unit must be powered off ,... deprived of it. Electrical ! CAUTION The wiring of excessive pump head pressure. IMPORTANT The piping sequence is not necessary unless ...
Heat Pro
Page 10
... must be placed before or upstream from the heat pump. 4. This includes the metal framework of the pool, the light, the pump, the filter (if made out of the heat pump. 3. Bonding ! CAUTION Because all metals have different electrical potentials, all systems for bypass plumbing) 8 OWNER'S MANUAL On some...components must be installed between the heater and any other , and then to 8 foot solid copper rod must be driven into the ground near the equipment. A 1/3 lb check valve must then be installed after or downstream of metal), the heater, any automatic chlorine generator...
... must be placed before or upstream from the heat pump. 4. This includes the metal framework of the pool, the light, the pump, the filter (if made out of the heat pump. 3. Bonding ! CAUTION Because all metals have different electrical potentials, all systems for bypass plumbing) 8 OWNER'S MANUAL On some...components must be installed between the heater and any other , and then to 8 foot solid copper rod must be driven into the ground near the equipment. A 1/3 lb check valve must then be installed after or downstream of metal), the heater, any automatic chlorine generator...