Owner's Manual for High Voltage 3-Phase PDU 932906
Page 1
....rrciaopmp /Lwitaerranty Distribution Units Switched PDU3VSR-Series & PDU3XVSR-Series Monitored PDU3VN-Series & PDU3XVN-Series Important Safety Insructions 2 Installation 2 Digital Load Meter 7 Features 9 Configuration and Operation 11 Service 11 Warranty and Warranty Registration 12 Español 13 Français 25 201104185 93-2906.indb 1 1111 W. 35th Street, Chicago, IL 60609 USA www.tripplite.com/support Copyright © 2011 Tripp Lite.
....rrciaopmp /Lwitaerranty Distribution Units Switched PDU3VSR-Series & PDU3XVSR-Series Monitored PDU3VN-Series & PDU3XVN-Series Important Safety Insructions 2 Installation 2 Digital Load Meter 7 Features 9 Configuration and Operation 11 Service 11 Warranty and Warranty Registration 12 Español 13 Français 25 201104185 93-2906.indb 1 1111 W. 35th Street, Chicago, IL 60609 USA www.tripplite.com/support Copyright © 2011 Tripp Lite.
Owner's Manual for High Voltage 3-Phase PDU 932906
Page 2
... power cables. • Do not attempt to use only in the rack enclosure, align the buttons with your PDU model. Failure to heed these instructions and warnings may differ somewhat from excess moisture, temperature extremes, conductive contaminants, dust or direct sunlight. • Do not connect the PDU to an ungrounded outlet or to extension cords or adapters that came with the rack mounting...
... power cables. • Do not attempt to use only in the rack enclosure, align the buttons with your PDU model. Failure to heed these instructions and warnings may differ somewhat from excess moisture, temperature extremes, conductive contaminants, dust or direct sunlight. • Do not connect the PDU to an ungrounded outlet or to extension cords or adapters that came with the rack mounting...
Owner's Manual for High Voltage 3-Phase PDU 932906
Page 3
... Output Current Cord input plug) Voltage Voltage per Phase Length Outlets Outlet Control 30A Blue IEC 309 3P+E 24 208 208 13.9 A 60A Blue IEC 309 3P+E 35 208 208 20.0 A Hubbell CS8365C 35 208 208 20.0 A L15-30P L21-30P 24 24 208 208 13.9 A 10 ft. Installation Connecting the PDU 2-1 Each model is equipped with 1 of 8 different input plugs. 16A Red IEC...
... Output Current Cord input plug) Voltage Voltage per Phase Length Outlets Outlet Control 30A Blue IEC 309 3P+E 24 208 208 13.9 A 60A Blue IEC 309 3P+E 35 208 208 20.0 A Hubbell CS8365C 35 208 208 20.0 A L15-30P L21-30P 24 24 208 208 13.9 A 10 ft. Installation Connecting the PDU 2-1 Each model is equipped with 1 of 8 different input plugs. 16A Red IEC...
Owner's Manual for High Voltage 3-Phase PDU 932906
Page 4
... outlet illuminates when the outlet is printed on the PDU. Dynamic IP Address Assignment 3-1 Connect PDU to Network: While the PDU is powered, connect a standard Ethernet patch cable to the RJ-45 Ethernet port on your network environment. 4 201104185 93-2906.indb 4 5/18/2011 1:36:01 PM PDU3VSR (3 banks of 10 C13s and 2 C19s). On the Switched models, the LED near each equipment power cord to the retention bracket. Some Models...
... outlet illuminates when the outlet is printed on the PDU. Dynamic IP Address Assignment 3-1 Connect PDU to Network: While the PDU is powered, connect a standard Ethernet patch cable to the RJ-45 Ethernet port on your network environment. 4 201104185 93-2906.indb 4 5/18/2011 1:36:01 PM PDU3VSR (3 banks of 10 C13s and 2 C19s). On the Switched models, the LED near each equipment power cord to the retention bracket. Some Models...
Owner's Manual for High Voltage 3-Phase PDU 932906
Page 5
... to DB9 configuration cable (part number 73-1243) included with dashes (-) representing dots or periods (.). Installation Dynamic IP Address Assignment 3-2 Discover IP Address: Contact your application. Rebooting the network card will display one letter at one end of the cable connects to the computer's serial port. 4-4 Press SNMP Reset Button: Press the reset button for assistance. 4-2 Configure Terminal Emulation Program: Open a VT100-compatible terminal emulation...
... to DB9 configuration cable (part number 73-1243) included with dashes (-) representing dots or periods (.). Installation Dynamic IP Address Assignment 3-2 Discover IP Address: Contact your application. Rebooting the network card will display one letter at one end of the cable connects to the computer's serial port. 4-4 Press SNMP Reset Button: Press the reset button for assistance. 4-2 Configure Terminal Emulation Program: Open a VT100-compatible terminal emulation...
Owner's Manual for High Voltage 3-Phase PDU 932906
Page 6
... other settings. (Tripp Lite recommends against changing the default settings unless you are shown - supply your own IP information when you can enter a new value. Sample IP settings are an advanced user with PoE (Power over Ethernet) applications. 6 201104185 93-2906.indb 6 5/18/2011 1:36:02 PM M Enter the root password: ********* Reset configuration to Modify? Network Connection 5-1 Connect PDU to Network: While the PDU is TrippLite. The default terminal mode root password is powered, connect a standard Ethernet...
... other settings. (Tripp Lite recommends against changing the default settings unless you are shown - supply your own IP information when you can enter a new value. Sample IP settings are an advanced user with PoE (Power over Ethernet) applications. 6 201104185 93-2906.indb 6 5/18/2011 1:36:02 PM M Enter the root password: ********* Reset configuration to Modify? Network Connection 5-1 Connect PDU to Network: While the PDU is TrippLite. The default terminal mode root password is powered, connect a standard Ethernet...
Owner's Manual for High Voltage 3-Phase PDU 932906
Page 7
... for 4 seconds, the numbers in the B product package. Pressing this button for a password A . Open a Web browser on Phase Bank 1, located nearest to show total current for Network Management System Users Only: Two MIB files - Installation Network Connection 5-2 Access PDU with Web Browser: After an IP address has been assigned to the PDU, attempt to the PDU. You should be mounted with the power cord facing the top...
... for 4 seconds, the numbers in the B product package. Pressing this button for a password A . Open a Web browser on Phase Bank 1, located nearest to show total current for Network Management System Users Only: Two MIB files - Installation Network Connection 5-2 Access PDU with Web Browser: After an IP address has been assigned to the PDU, attempt to the PDU. You should be mounted with the power cord facing the top...
Owner's Manual for High Voltage 3-Phase PDU 932906
Page 8
... at a time. Outlets 1-8 will flash Phase 1 LED D , outlets 9-16 will flash Phase 2 LED E and outlets 17-24 will flash Phase 3 LED F . (For All Models): If you move between outlets and their respective Phases. If there is no address" will display E the current for the first individual outlet, A located nearest the input cord. Digital Load Meter 2 Receptacle Current/IP Show Button (Model PDU3VSR & PDU3XVSR Only): This button B can display...
... at a time. Outlets 1-8 will flash Phase 1 LED D , outlets 9-16 will flash Phase 2 LED E and outlets 17-24 will flash Phase 3 LED F . (For All Models): If you move between outlets and their respective Phases. If there is no address" will display E the current for the first individual outlet, A located nearest the input cord. Digital Load Meter 2 Receptacle Current/IP Show Button (Model PDU3VSR & PDU3XVSR Only): This button B can display...
Owner's Manual for High Voltage 3-Phase PDU 932906
Page 9
.... Cord Retention Bracket: Provides secure attachment points for that phase of the PDU, the circuit breaker will trip. Mounting Brackets: Use these brackets to connected equipment. Rebooting the network card will illuminate when the associated outlet is ready to distribute live AC power (PDU3VSR & PDU3XVSR models only). Features Outlets: During normal operation, the outlets distribute AC power to mount the PDU. SNMP Reset Button: Press the reset button for ordering information. Circuit Breaker...
.... Cord Retention Bracket: Provides secure attachment points for that phase of the PDU, the circuit breaker will trip. Mounting Brackets: Use these brackets to connected equipment. Rebooting the network card will illuminate when the associated outlet is ready to distribute live AC power (PDU3VSR & PDU3XVSR models only). Features Outlets: During normal operation, the outlets distribute AC power to mount the PDU. SNMP Reset Button: Press the reset button for ordering information. Circuit Breaker...
Owner's Manual for High Voltage 3-Phase PDU 932906
Page 10
... RJ-45 jack to connect the PDU to the network with PoE (Power Over Ethernet) applications. Ethernet Port: Use this port. Features RJ-45 Modem Port: Reserved for configuration by factory authorized personnel only. A B Network Operating Conditions A Link LED Color Off Flashing Amber Flashing Green No Network Connection 100 Mbps Network Connection 10 Mbps Network Connection B Status LED Color Off Steady or Flashing Green Steady Amber Card Not Initialized Card Initialized and Operational Error - Card Not Initialized 10...
... RJ-45 jack to connect the PDU to the network with PoE (Power Over Ethernet) applications. Ethernet Port: Use this port. Features RJ-45 Modem Port: Reserved for configuration by factory authorized personnel only. A B Network Operating Conditions A Link LED Color Off Flashing Amber Flashing Green No Network Connection 100 Mbps Network Connection 10 Mbps Network Connection B Status LED Color Off Steady or Flashing Green Steady Amber Card Not Initialized Card Initialized and Operational Error - Card Not Initialized 10...
Owner's Manual for High Voltage 3-Phase PDU 932906
Page 11
... the product for service, follow these steps: 1. Review the installation and operation procedures in this manual to insure that the service problem does not originate from Tripp Lite. A B Service Your Tripp Lite product is within its warranty period, enclose a copy of the instructions. 2. Configuration and Operation Remote Monitoring and Control The PDU provides remote monitoring A , outlet control B and more via thePowerAlert Web browser interface, refer to the SNMPWEBCARD User's Guide, included on...
... the product for service, follow these steps: 1. Review the installation and operation procedures in this manual to insure that the service problem does not originate from Tripp Lite. A B Service Your Tripp Lite product is within its warranty period, enclose a copy of the instructions. 2. Configuration and Operation Remote Monitoring and Control The PDU provides remote monitoring A , outlet control B and more via thePowerAlert Web browser interface, refer to the SNMPWEBCARD User's Guide, included on...
Owner's Manual for High Voltage 3-Phase PDU 932906
Page 12
... marking name or model number of the FCC Rules. Seller will repair or replace the product, in accordance with all applicable instructions, to use intended. EXCEPT TO THE EXTENT PROHIBITED BY APPLICABLE LAW, ALL IMPLIED WARRANTIES, INCLUDING ALL WARRANTIES OF MERCHANTABILITY OR FITNESS, ARE LIMITED IN DURATION TO THE WARRANTY PERIOD SET FORTH ABOVE; WARNING: The individual user should prove defective...
... marking name or model number of the FCC Rules. Seller will repair or replace the product, in accordance with all applicable instructions, to use intended. EXCEPT TO THE EXTENT PROHIBITED BY APPLICABLE LAW, ALL IMPLIED WARRANTIES, INCLUDING ALL WARRANTIES OF MERCHANTABILITY OR FITNESS, ARE LIMITED IN DURATION TO THE WARRANTY PERIOD SET FORTH ABOVE; WARNING: The individual user should prove defective...