Installation Instructions
Page 5
... You Begin Preparation Tools and Parts Needed 1. Foam tape 2. Screws, #10-32 x 2 1/2" (63.8mm) (4) 4. Overall Dimensions Width (Side to Side) Depth (Front to Back) Height (Top to the pressure regulator supplied with this unit. The propane gas tank must be installed above any Bosch single builtin oven as...cook top and the top of the cabinet. Drill with natural gas. Hold down brackets (4) 3. Plan the installation so that the power connection is shipped from the front of the oven. Cabinet Requirements Dimension requirements in the toe kick area or other cabinet area for use...
... You Begin Preparation Tools and Parts Needed 1. Foam tape 2. Screws, #10-32 x 2 1/2" (63.8mm) (4) 4. Overall Dimensions Width (Side to Side) Depth (Front to Back) Height (Top to the pressure regulator supplied with this unit. The propane gas tank must be installed above any Bosch single builtin oven as...cook top and the top of the cabinet. Drill with natural gas. Hold down brackets (4) 3. Plan the installation so that the power connection is shipped from the front of the oven. Cabinet Requirements Dimension requirements in the toe kick area or other cabinet area for use...