Hardware Installation Guide
Page 6
... Power Connectors 1-21 Internal Power Supply Connector 1-21 DC Power Connector 1-21 Cisco RPS Connector 1-22 Console Port 1-23 2 C H A P T E R Installation 2-1 Preparing for Installation 2-1 Warnings 2-1 EMC Regulatory Statements 2-4 U.S.A. 2-4 Taiwan 2-4 Japan 2-5 Korea 2-5 Hungary 2-6 Installation Guidelines 2-6 Verifying Package Contents 2-7 Installing the Switch on a Table or Shelf 2-9 Installing the Switch in a Rack 2-9 Removing Screws from the Switch 2-11 Attaching the Brackets to a Catalyst...
... Power Connectors 1-21 Internal Power Supply Connector 1-21 DC Power Connector 1-21 Cisco RPS Connector 1-22 Console Port 1-23 2 C H A P T E R Installation 2-1 Preparing for Installation 2-1 Warnings 2-1 EMC Regulatory Statements 2-4 U.S.A. 2-4 Taiwan 2-4 Japan 2-5 Korea 2-5 Hungary 2-6 Installation Guidelines 2-6 Verifying Package Contents 2-7 Installing the Switch on a Table or Shelf 2-9 Installing the Switch in a Rack 2-9 Removing Screws from the Switch 2-11 Attaching the Brackets to a Catalyst...
Hardware Installation Guide
Page 8
... Identifying a Rollover Cable B-6 Connecting to a PC B-6 Connecting to a Terminal B-7 Translated Safety Warnings C-1 Attaching the Cisco RPS (model PWR600-AC-RPS) C-1 Attaching the Cisco RPS (model PWR300-AC-RPS-N1) C-2 Qualified Personnel Warning C-3 Installation Warning C-4 Jewelry Removal Warning C-5 Stacking the... C-9 TN Power Warning C-10 Ground Connection Warning C-11 Circuit Breaker (15A) Warning C-12 Grounded Equipment Warning C-14 Supply Circuit Warning C-15 Voltage Warning C-16 Power Supply Warning C-17 Lightning Activity Warning C-19 Product Disposal Warning C-21 Catalyst 2900 Series ...
... Identifying a Rollover Cable B-6 Connecting to a PC B-6 Connecting to a Terminal B-7 Translated Safety Warnings C-1 Attaching the Cisco RPS (model PWR600-AC-RPS) C-1 Attaching the Cisco RPS (model PWR300-AC-RPS-N1) C-2 Qualified Personnel Warning C-3 Installation Warning C-4 Jewelry Removal Warning C-5 Stacking the... C-9 TN Power Warning C-10 Ground Connection Warning C-11 Circuit Breaker (15A) Warning C-12 Grounded Equipment Warning C-14 Supply Circuit Warning C-15 Voltage Warning C-16 Power Supply Warning C-17 Lightning Activity Warning C-19 Product Disposal Warning C-21 Catalyst 2900 Series ...
Hardware Installation Guide
Page 33
... the switch AC power supply are both powered up power, if required. RPS is not a recommended configuration. Chapter 1 Product Overview Front-Panel Description RPS LED The Catalyst 2912 LRE XL and Catalyst 2924 LRE XL switches use the Cisco RPS 600 (model PWR600-AC-RPS). RPS is not installed. All other Catalyst 2900 XL and Catalyst 3500 XL switches use the Cisco RPS...
... the switch AC power supply are both powered up power, if required. RPS is not a recommended configuration. Chapter 1 Product Overview Front-Panel Description RPS LED The Catalyst 2912 LRE XL and Catalyst 2924 LRE XL switches use the Cisco RPS 600 (model PWR600-AC-RPS). RPS is not installed. All other Catalyst 2900 XL and Catalyst 3500 XL switches use the Cisco RPS...
Hardware Installation Guide
Page 34
...Table 1-4 Port Mode LEDs on the RPS, and the LED should turn green. The current bandwidth in a fault condition. Contact Cisco Systems. The internal power supply in a switch has failed, and the RPS is highlighted. Table 1-6 and Table 1-7 list the port LED colors. When you change a ...Gigabit ports: auto The port operating speed: 10 or 100 Mbps. 1-14 Catalyst 2900 Series XL Hardware Installation Guide 78-6461-04 These port LEDs, as a group or individually, display information about the switch and about the individual ports. Front-Panel Description Chapter 1 Product Overview Table...
...Table 1-4 Port Mode LEDs on the RPS, and the LED should turn green. The current bandwidth in a fault condition. Contact Cisco Systems. The internal power supply in a switch has failed, and the RPS is highlighted. Table 1-6 and Table 1-7 list the port LED colors. When you change a ...Gigabit ports: auto The port operating speed: 10 or 100 Mbps. 1-14 Catalyst 2900 Series XL Hardware Installation Guide 78-6461-04 These port LEDs, as a group or individually, display information about the switch and about the individual ports. Front-Panel Description Chapter 1 Product Overview Table...
Hardware Installation Guide
Page 41
... on page 2-29. 78-6461-04 Catalyst 2900 Series XL Hardware Installation Guide 1-21 DC Power Connector The Catalyst 2924M XL DC switch has an internal DC-power converter. If you plan to use the internal power supply, use the supplied AC power cord to connect the AC power connector to the switch either through the internal power supply or through the Cisco RPS.
... on page 2-29. 78-6461-04 Catalyst 2900 Series XL Hardware Installation Guide 1-21 DC Power Connector The Catalyst 2924M XL DC switch has an internal DC-power converter. If you plan to use the internal power supply, use the supplied AC power cord to connect the AC power connector to the switch either through the internal power supply or through the Cisco RPS.
Hardware Installation Guide
Page 42
... external devices that has an input supply voltage from -36 to an AC outlet if the switch is not. The power source is not in the RPS documentation. The switches do not recommend the redundant-with-reboot configuration. Cisco RPS Connector Specific Cisco RPS models support specific Catalyst 2900 XL switches: • Cisco RPS 600 (model PWR600-AC-RPS...
... external devices that has an input supply voltage from -36 to an AC outlet if the switch is not. The power source is not in the RPS documentation. The switches do not recommend the redundant-with-reboot configuration. Cisco RPS Connector Specific Cisco RPS models support specific Catalyst 2900 XL switches: • Cisco RPS 600 (model PWR600-AC-RPS...
Hardware Installation Guide
Page 43
... the Console Port" section on the Cisco RPS 300, refer to the Cisco Redundant Power System 300 Hardware Installation Guide. Chapter 1 Product Overview Power Connectors RPS Connector on the Catalyst 2912 LRE and 2924 LRE XL Switches The RPS is a 300W redundant power system that adapter from Cisco. It automatically senses when the power supply of a connected device fails and...
... the Console Port" section on the Cisco RPS 300, refer to the Cisco Redundant Power System 300 Hardware Installation Guide. Chapter 1 Product Overview Power Connectors RPS Connector on the Catalyst 2912 LRE and 2924 LRE XL Switches The RPS is a 300W redundant power system that adapter from Cisco. It automatically senses when the power supply of a connected device fails and...
Hardware Installation Guide
Page 47
... power switch, line voltages are present within the power supply when the power cord is connected. For systems with a power switch, line voltages are present within the power supply even when the power switch is off and the power ...on the label is connected to the supply circuit so that receptacle. Ensure that the host is different from the power outlet voltage, do not connect the ...is intended to that wiring is connected. Warning Do not touch the power supply when the power cord is not overloaded. Chapter 2 Installation Preparing for Installation Warning This ...
... power switch, line voltages are present within the power supply when the power cord is connected. For systems with a power switch, line voltages are present within the power supply even when the power switch is off and the power ...on the label is connected to the supply circuit so that receptacle. Ensure that the host is different from the power outlet voltage, do not connect the ...is intended to that wiring is connected. Warning Do not touch the power supply when the power cord is not overloaded. Chapter 2 Installation Preparing for Installation Warning This ...
Hardware Installation Guide
Page 53
...a table or shelf: Step 1 Step 2 Step 3 Locate the adhesive strip with the rubber feet in "Powering On the Switch and Running POST" section on page 2-24. The supplied rack-mounting brackets can be mounted at the bottom of the rack. • If the rack is provided with...Note Figure 2-1 shows brackets for one-rack-unit switches. 78-6461-04 Catalyst 2900 Series XL Hardware Installation Guide 2-9 Place the switch on brackets for two-rack-unit modular switches. Chapter 2 Installation Installing the Switch on a Table or Shelf Installing the Switch on a Table or Shelf Follow these steps to...
...a table or shelf: Step 1 Step 2 Step 3 Locate the adhesive strip with the rubber feet in "Powering On the Switch and Running POST" section on page 2-24. The supplied rack-mounting brackets can be mounted at the bottom of the rack. • If the rack is provided with...Note Figure 2-1 shows brackets for one-rack-unit switches. 78-6461-04 Catalyst 2900 Series XL Hardware Installation Guide 2-9 Place the switch on brackets for two-rack-unit modular switches. Chapter 2 Installation Installing the Switch on a Table or Shelf Installing the Switch on a Table or Shelf Follow these steps to...
Hardware Installation Guide
Page 63
...78-6461-04 Catalyst 2900 Series XL Hardware Installation Guide 2-19 If the switch is mounted in the rack, power the switch as shown in Figure 2-12 to attach the cable guide to prevent the cables from obscuring the front panel of the switch and the other devices installed in "Powering On the Switch and Running POST...12 MODE 1X 2X 3X Catalyst 2900 SERIES XL 4X 5X 6X 7X 8X 9X 100BaseFX 10X 11X 12X 13X 14X 15X 16X 17X 18X 19X 20X 21X 22X 23X 24X Phillips machine screws After the switch is in a 19-, 23-, or 24-inch rack, use the supplied black screw as described ...
...78-6461-04 Catalyst 2900 Series XL Hardware Installation Guide 2-19 If the switch is mounted in the rack, power the switch as shown in Figure 2-12 to attach the cable guide to prevent the cables from obscuring the front panel of the switch and the other devices installed in "Powering On the Switch and Running POST...12 MODE 1X 2X 3X Catalyst 2900 SERIES XL 4X 5X 6X 7X 8X 9X 100BaseFX 10X 11X 12X 13X 14X 15X 16X 17X 18X 19X 20X 21X 22X 23X 24X Phillips machine screws After the switch is in a 19-, 23-, or 24-inch rack, use the supplied black screw as described ...
Hardware Installation Guide
Page 68
... they turn green. Catalyst 2900 Series XL Hardware Installation Guide 78-6461-04 Step 2 Connect the other end of eight tests that run automatically to ensure that the switch functions properly. Powering On the Switch and Running POST To power on the switch after you install it..., follow these steps: Step 1 Connect one end of the AC power cord to the AC power connector on , it begins POST, a series of the power cord to a Wall Vertical wall stud User-supplied screws User-supplied...
... they turn green. Catalyst 2900 Series XL Hardware Installation Guide 78-6461-04 Step 2 Connect the other end of eight tests that run automatically to ensure that the switch functions properly. Powering On the Switch and Running POST To power on the switch after you install it..., follow these steps: Step 1 Connect one end of the AC power cord to the AC power connector on , it begins POST, a series of the power cord to a Wall Vertical wall stud User-supplied screws User-supplied...
Hardware Installation Guide
Page 159
... (telco rack-mount) modules 1-8 mounting brackets 2-9 attaching 2-11, 2-15, 2-22 N no on/off switch warning C-24 O overtemperature warning C-9 P PC, connecting to switch 2-42 performance problems, solving 3-3 personnel warning C-3 pinouts 10/100BASE-T ports B-2 cable, straight-through and crossover...16 to 1-18 POST results 2-24 power connecting to 2-24 warning C-15 power connectors 1-21 power on 2-24 power supply AC power outlet 1-21 RPS connector 1-21 warning C-17 product disposal warning C-21 Q qualified personnel warning C-3 78-6461-04 Catalyst 2900 Series XL Hardware Installation Guide ...
... (telco rack-mount) modules 1-8 mounting brackets 2-9 attaching 2-11, 2-15, 2-22 N no on/off switch warning C-24 O overtemperature warning C-9 P PC, connecting to switch 2-42 performance problems, solving 3-3 personnel warning C-3 pinouts 10/100BASE-T ports B-2 cable, straight-through and crossover...16 to 1-18 POST results 2-24 power connecting to 2-24 warning C-15 power connectors 1-21 power on 2-24 power supply AC power outlet 1-21 RPS connector 1-21 warning C-17 product disposal warning C-21 Q qualified personnel warning C-3 78-6461-04 Catalyst 2900 Series XL Hardware Installation Guide ...
Hardware Installation Guide
Page 160
... cables straight-through B-4 SunNet Manager 1-4 supply circuit warning C-15 switch powering on 2-24 switched ports, module 1-8 System LED 1-12 T telco racks 2-15 telephone network power warning See TN power warning C-10 temperature maximum for installation 2-7, A-2 warning C-9 temperature warning C-9 terminal, connecting to switch 2-42 terminal adapter pinouts RH-45-to-RJ-45 B-7 IN-6 Catalyst 2900 Series XL Hardware Installation...
... cables straight-through B-4 SunNet Manager 1-4 supply circuit warning C-15 switch powering on 2-24 switched ports, module 1-8 System LED 1-12 T telco racks 2-15 telephone network power warning See TN power warning C-10 temperature maximum for installation 2-7, A-2 warning C-9 temperature warning C-9 terminal, connecting to switch 2-42 terminal adapter pinouts RH-45-to-RJ-45 B-7 IN-6 Catalyst 2900 Series XL Hardware Installation...