Instruction Manual
Page 1
... play in the area around the heater. 8 DO NOT use a naked flame to instruction manual Warning Hot surface 1. Three heat output settings ranging from the heater is 1 metre. 9 Position the heater so that the heater is facing towards the middle of a room and away from burns. Supplied with Butane gas - NOTE THE SAFE OPERATIONAL REQUIREMENTS, WARNINGS & CAUTIONS. SAFETY THIS...
... play in the area around the heater. 8 DO NOT use a naked flame to instruction manual Warning Hot surface 1. Three heat output settings ranging from the heater is 1 metre. 9 Position the heater so that the heater is facing towards the middle of a room and away from burns. Supplied with Butane gas - NOTE THE SAFE OPERATIONAL REQUIREMENTS, WARNINGS & CAUTIONS. SAFETY THIS...
Instruction Manual
Page 2
...Sealey Limited Original Language Version CH4200.V3 Issue:1 14/03/22 See table below . 8 DO NOT place the heater in position 3) 4.1.5. Some symptoms of the symptoms present, switch the heater off and have it could be exposed to be produced if the heater is not working correctly. If the heater...: Ceramic burner panels are dull, gas burns with a blue haze, soot deposits on the burner panels, burner panels or cement fixings are open and not blocked. If the heater shuts down if not enough fresh oxygen content is installed. The heater needs a fresh air supply...
...Sealey Limited Original Language Version CH4200.V3 Issue:1 14/03/22 See table below . 8 DO NOT place the heater in position 3) 4.1.5. Some symptoms of the symptoms present, switch the heater off and have it could be exposed to be produced if the heater is not working correctly. If the heater...: Ceramic burner panels are dull, gas burns with a blue haze, soot deposits on the burner panels, burner panels or cement fixings are open and not blocked. If the heater shuts down if not enough fresh oxygen content is installed. The heater needs a fresh air supply...
Instruction Manual
Page 3
... lit, keep holding down the heat control dial down the heat control dial for slightly longer. If the pilot light extinguishes, repeat the procedure, holding down for a few seconds and turn the heater off , the regulator release button will invalidate the warranty. Only to alter data, specifications and component parts without prior notice. Hold in fig.5). WARNING! Parts support is our...
... lit, keep holding down the heat control dial down the heat control dial for slightly longer. If the pilot light extinguishes, repeat the procedure, holding down for a few seconds and turn the heater off , the regulator release button will invalidate the warranty. Only to alter data, specifications and component parts without prior notice. Hold in fig.5). WARNING! Parts support is our...
Instruction Manual
Page 4
... flam e power requir ement With working time limitation P(ifiloatpfplalicmaeblpeo)*we r required Ppilot 0.19 kW With black bulb sensor The seasonal space heating energy efficiency ƞs Item Symbol Value Yes No Yes No Yes No Unit The seasonal space heating Energy efficiency in active mode The seasonal space heating energy efficiency ƞs ƞs,on 100.0 % ƞs 88 .7 % Energy efficiency classes A Contact details: Sealey Group...
... flam e power requir ement With working time limitation P(ifiloatpfplalicmaeblpeo)*we r required Ppilot 0.19 kW With black bulb sensor The seasonal space heating energy efficiency ƞs Item Symbol Value Yes No Yes No Yes No Unit The seasonal space heating Energy efficiency in active mode The seasonal space heating energy efficiency ƞs ƞs,on 100.0 % ƞs 88 .7 % Energy efficiency classes A Contact details: Sealey Group...
Declaration of Conformity
Page 1
...the certificate(s): Assessment Procedure MB 69259146 0001 Signed Date..........0..3../.0..2../.2..0..2..2 Name........S...te..v..e...B..u..c..k..l.e Position....M...a..r.k..e.t.i.n..g...D...ir.e..c..t.o..r Place: Bury St Edmunds Sealey Group, Kempson Way, Suffolk Business Park, Bury St Edmunds, Suffolk. IP32 7AR Approved Body: TÜV ...65533;t��e��r���4 2���k���W Model/Type C���H����4��2���0��...
...the certificate(s): Assessment Procedure MB 69259146 0001 Signed Date..........0..3../.0..2../.2..0..2..2 Name........S...te..v..e...B..u..c..k..l.e Position....M...a..r.k..e.t.i.n..g...D...ir.e..c..t.o..r Place: Bury St Edmunds Sealey Group, Kempson Way, Suffolk Business Park, Bury St Edmunds, Suffolk. IP32 7AR Approved Body: TÜV ...65533;t��e��r���4 2���k���W Model/Type C���H����4��2���0��...