Owner's Manual for 3 Phase Battery Cabinet 932796
Page 1
... Diagram (3 Shelves) 6-3 Battery and Breaker Diagrams (240 VDC) 6-4 Battery and Breaker Diagrams (+/- 240 VDC) 6-5 Battery Charger (Select Models) 7 - Introduction 2 - Important Safety Instructions 3 - Maintenance 5-1 Maintenance Schedule 5-2 Fuse Replacement 6 - Warranty p. 2 p. 3 p. 5 p. 5 p. 5 p. 5 p. 6 p. 6 p. 6 p. 7 p. 7 p. 7 p. 8 p. 8 p. 8 p. 8 p. 8 p. 9 p. 9 p. 9 p. 10 p. 10 p. 11 p. 12 p. 13 p. 14 p. 15 p. 15 p. 15 p. 16 p. 16 1111 W. 35th Street, Chicago, IL 60609 USA +1.773.869.1234 • www.tripplite.com Copyright © 2008 Tripp Lite. Battery Cabinet Installation...
... Diagram (3 Shelves) 6-3 Battery and Breaker Diagrams (240 VDC) 6-4 Battery and Breaker Diagrams (+/- 240 VDC) 6-5 Battery Charger (Select Models) 7 - Introduction 2 - Important Safety Instructions 3 - Maintenance 5-1 Maintenance Schedule 5-2 Fuse Replacement 6 - Warranty p. 2 p. 3 p. 5 p. 5 p. 5 p. 5 p. 6 p. 6 p. 6 p. 7 p. 7 p. 7 p. 8 p. 8 p. 8 p. 8 p. 8 p. 9 p. 9 p. 9 p. 10 p. 10 p. 11 p. 12 p. 13 p. 14 p. 15 p. 15 p. 15 p. 16 p. 16 1111 W. 35th Street, Chicago, IL 60609 USA +1.773.869.1234 • www.tripplite.com Copyright © 2008 Tripp Lite. Battery Cabinet Installation...
Owner's Manual for 3 Phase Battery Cabinet 932796
Page 2
... in compliance with a double layer of the individual batteries is provided via ½-inch spacing between batteries. 1 - Introduction Tripp Lite's Extended-Run 3-Phase Battery Cabinets connect to SmartOnline 3-Phase UPS Systems to 720 ampere-hours with a UV relay, shunt trip and auxiliary contacts as additional options.) f User-supplied power output cables can be connected in voltages from...
... in compliance with a double layer of the individual batteries is provided via ½-inch spacing between batteries. 1 - Introduction Tripp Lite's Extended-Run 3-Phase Battery Cabinets connect to SmartOnline 3-Phase UPS Systems to 720 ampere-hours with a UV relay, shunt trip and auxiliary contacts as additional options.) f User-supplied power output cables can be connected in voltages from...
Owner's Manual for 3 Phase Battery Cabinet 932796
Page 3
...codes. Failure to observe proper polarity may damage the batteries and create a serious risk of the battery cabinet for serious personal injury. • Do not attempt to comply may cause serious personal injury and property damage. The disconnect device must be performed by a qualified electrician, in accordance with "C" models...sunlight. • Install the battery cabinet in the presence of the life support equipment or to cause personal injury or death from shorting on the battery cabinet, especially containers of this manual contain instructions and warnings that...
...codes. Failure to observe proper polarity may damage the batteries and create a serious risk of the battery cabinet for serious personal injury. • Do not attempt to comply may cause serious personal injury and property damage. The disconnect device must be performed by a qualified electrician, in accordance with "C" models...sunlight. • Install the battery cabinet in the presence of the life support equipment or to cause personal injury or death from shorting on the battery cabinet, especially containers of this manual contain instructions and warnings that...
Owner's Manual for 3 Phase Battery Cabinet 932796
Page 4
... be turned on and the batteries should open or mutilate batteries-released electrolyte is operating from Tripp Lite. • The batteries are no user-serviceable parts inside. Do not lay tools or metal parts on Labeling These symbols may cause permanent battery damage. • Allow batteries to the product label for an extended period of hydrogen gas. Note on top of batteries. • Replace batteries...
... be turned on and the batteries should open or mutilate batteries-released electrolyte is operating from Tripp Lite. • The batteries are no user-serviceable parts inside. Do not lay tools or metal parts on Labeling These symbols may cause permanent battery damage. • Allow batteries to the product label for an extended period of hydrogen gas. Note on top of batteries. • Replace batteries...
Owner's Manual for 3 Phase Battery Cabinet 932796
Page 5
... movement within a facility. The battery cabinet must be installed in the battery cabinet and that all the battery terminal connections to off-load the battery cabinet from shipping, contact Tripp Lite. Remove front access panels and set them aside, being installed. If any doorways along the transport route will not be installed nearby. • Draw a wiring schematic representing the cables connected...
... movement within a facility. The battery cabinet must be installed in the battery cabinet and that all the battery terminal connections to off-load the battery cabinet from shipping, contact Tripp Lite. Remove front access panels and set them aside, being installed. If any doorways along the transport route will not be installed nearby. • Draw a wiring schematic representing the cables connected...
Owner's Manual for 3 Phase Battery Cabinet 932796
Page 6
..., hardware and instructions required to complete the connection will not be accessible and removable to allow easy access to internal batteries, internal fuses and other equipment installed nearby. (See Section 7-1 for dimensions. The surface must be wired directly to support the battery cabinet and other overcurrent protection devices. (See Section 7-1 for floor loading specifications.) 2. Forklift forks...
..., hardware and instructions required to complete the connection will not be accessible and removable to allow easy access to internal batteries, internal fuses and other equipment installed nearby. (See Section 7-1 for dimensions. The surface must be wired directly to support the battery cabinet and other overcurrent protection devices. (See Section 7-1 for floor loading specifications.) 2. Forklift forks...
Owner's Manual for 3 Phase Battery Cabinet 932796
Page 7
...repair. • The DC rated fuses and DC molded case circuit breakers are connected in parallel, they should be protected and the DC short circuit current of the battery. • When the battery cabinets are UL-listed for branch circuit protection. Select battery cabinets ("C" models only) include an integrated battery charger. Set the battery... grounding cable to the grounding lug mounted in this manual and all applicable local, state and national codes (including NEC) for a terminal block diagram and additional battery charger information. 2. Refer to 500 MCM (500 kcmil...
...repair. • The DC rated fuses and DC molded case circuit breakers are connected in parallel, they should be protected and the DC short circuit current of the battery. • When the battery cabinets are UL-listed for branch circuit protection. Select battery cabinets ("C" models only) include an integrated battery charger. Set the battery... grounding cable to the grounding lug mounted in this manual and all applicable local, state and national codes (including NEC) for a terminal block diagram and additional battery charger information. 2. Refer to 500 MCM (500 kcmil...
Owner's Manual for 3 Phase Battery Cabinet 932796
Page 8
...at the critical load. 6. If the acceptance test is now in operation. 4-4 Acceptance Test (Optional) 1. Close the disconnect switch/circuit breaker connection from the center of the individual batteries to monitoring at which the battery is now in operation. [8] Measure and record...Place the charger/rectifier in float charge mode. 6. Following completion of individual battery units. 4. After the battery cabinet has been on float for properly charging the battery cabinet should be useful in the battery cabinet by placing the surface thermocouple on...
...at the critical load. 6. If the acceptance test is now in operation. 4-4 Acceptance Test (Optional) 1. Close the disconnect switch/circuit breaker connection from the center of the individual batteries to monitoring at which the battery is now in operation. [8] Measure and record...Place the charger/rectifier in float charge mode. 6. Following completion of individual battery units. 4. After the battery cabinet has been on float for properly charging the battery cabinet should be useful in the battery cabinet by placing the surface thermocouple on...
Owner's Manual for 3 Phase Battery Cabinet 932796
Page 9
... capacity test is reduced by half at 92° F.) 2. Use insulated tools to tighten all connections to the cabinet. Battery units outside this range should measure 0 (zero) VDC. Install the replacement fuse and reconnect the output cables and/or terminal plates to these batteries or sample the electrolyte specific gravity. For example, battery lifespan will be replaced by...
... capacity test is reduced by half at 92° F.) 2. Use insulated tools to tighten all connections to the cabinet. Battery units outside this range should measure 0 (zero) VDC. Install the replacement fuse and reconnect the output cables and/or terminal plates to these batteries or sample the electrolyte specific gravity. For example, battery lifespan will be replaced by...
Owner's Manual for 3 Phase Battery Cabinet 932796
Page 10
6 - Diagrams 6-1 Battery Cabinet Diagram (4 Shelves) 4.38 Breaker Mounting Plate 8.25 24.75 6 22 16 79 16 4.5 Side View 16 4 11.75 5.5 Front View 40.25 4.5 2.25 15.75 Side View Front of Cabinet 6 6 Conduit Knockouts Top View 30.25 Conduit Knockouts Front of Cabinet Side View Note: All dimensions are in inches. 17.25 34.5 Bottom View [10] Side View
6 - Diagrams 6-1 Battery Cabinet Diagram (4 Shelves) 4.38 Breaker Mounting Plate 8.25 24.75 6 22 16 79 16 4.5 Side View 16 4 11.75 5.5 Front View 40.25 4.5 2.25 15.75 Side View Front of Cabinet 6 6 Conduit Knockouts Top View 30.25 Conduit Knockouts Front of Cabinet Side View Note: All dimensions are in inches. 17.25 34.5 Bottom View [10] Side View
Owner's Manual for 3 Phase Battery Cabinet 932796
Page 11
6 - Diagrams (continued) 6-2 Battery Cabinet Diagram (3 Shelves) 3.25 4.5 4.5 Side View 30 6 32 58 Top View Breaker Mounting 8.25 Plate 16 11 24 2.25 14 15.75 Side View Front of Cabinet 4 4 Conduit Knockouts 16 10.25 Front View Conduit Knockouts 14.5 Front of Cabinet Side View Note: All dimensions are inches. 29 Bottom View Side View [11]
6 - Diagrams (continued) 6-2 Battery Cabinet Diagram (3 Shelves) 3.25 4.5 4.5 Side View 30 6 32 58 Top View Breaker Mounting 8.25 Plate 16 11 24 2.25 14 15.75 Side View Front of Cabinet 4 4 Conduit Knockouts 16 10.25 Front View Conduit Knockouts 14.5 Front of Cabinet Side View Note: All dimensions are inches. 29 Bottom View Side View [11]
Owner's Manual for 3 Phase Battery Cabinet 932796
Page 12
Diagrams (continued) 6-3 Battery and Breaker Diagrams (240 VDC) Shelf 2 Shelf 3 To UPS Positive To UPS Negative UL-Listed Breaker Battery Positive Battery Negative Shelf 1 (Bottom) To Fuse or Breaker Termination Notes: • All internal wiring is UL-listed, MTW, 125C Hi-Flex cable. • Terminal block is ... UL-listed and rated for 150 A, 600 VDC, 25 KAIC. • Cabinets with breakers are shipped with the breaker in the off/open position. • Battery arrangements shown are typical but may vary depending on cabinet and...
Diagrams (continued) 6-3 Battery and Breaker Diagrams (240 VDC) Shelf 2 Shelf 3 To UPS Positive To UPS Negative UL-Listed Breaker Battery Positive Battery Negative Shelf 1 (Bottom) To Fuse or Breaker Termination Notes: • All internal wiring is UL-listed, MTW, 125C Hi-Flex cable. • Terminal block is ... UL-listed and rated for 150 A, 600 VDC, 25 KAIC. • Cabinets with breakers are shipped with the breaker in the off/open position. • Battery arrangements shown are typical but may vary depending on cabinet and...
Owner's Manual for 3 Phase Battery Cabinet 932796
Page 13
6 - Diagrams (continued) 6-4 Battery and Breaker Diagrams (+/- 240 VDC) Shelf 4 (Top) Shelf 3 Shelf 2 To UPS Positive To UPS Negative To UPS Center Tap Battery Positive UL-Listed Breaker Battery Negative From Battery Center Tap Shelf 1 (Bottom) To Fuse or Breaker Termination To Center Tap Termination Notes: • All internal wiring is UL-listed, MTW, 125C Hi-Flex ... UL-listed and rated for 250 A, 600 VDC, 25 KAIC. • Cabinets with breakers are shipped with the breaker in the off/open position. • Battery arrangements shown are typical but may vary depending on cabinet and...
6 - Diagrams (continued) 6-4 Battery and Breaker Diagrams (+/- 240 VDC) Shelf 4 (Top) Shelf 3 Shelf 2 To UPS Positive To UPS Negative To UPS Center Tap Battery Positive UL-Listed Breaker Battery Negative From Battery Center Tap Shelf 1 (Bottom) To Fuse or Breaker Termination To Center Tap Termination Notes: • All internal wiring is UL-listed, MTW, 125C Hi-Flex ... UL-listed and rated for 250 A, 600 VDC, 25 KAIC. • Cabinets with breakers are shipped with the breaker in the off/open position. • Battery arrangements shown are typical but may vary depending on cabinet and...
Owner's Manual for 3 Phase Battery Cabinet 932796
Page 14
... 120/208/240 VAC, 60 Hz. • Constant voltage output. • Electronic current limiting and high voltage shutdown. • AC and DC fusing. Diagrams (continued) 6-5 Integrated Battery Charger (Select Models) 6.25 MAX 0.5 12.5 13.5 Terminal Block Detail Input Voltage Selection For 120 VAC Jumper: 2 & 3, 3 & 4, 5 & 6 For 208 VAC Jumper: 1 & 2, 4 & 5 For 240 VAC Jumper: 2 & 3, 4 & 5 AC...
... 120/208/240 VAC, 60 Hz. • Constant voltage output. • Electronic current limiting and high voltage shutdown. • AC and DC fusing. Diagrams (continued) 6-5 Integrated Battery Charger (Select Models) 6.25 MAX 0.5 12.5 13.5 Terminal Block Detail Input Voltage Selection For 120 VAC Jumper: 2 & 3, 3 & 4, 5 & 6 For 208 VAC Jumper: 1 & 2, 4 & 5 For 240 VAC Jumper: 2 & 3, 4 & 5 AC...
Owner's Manual for 3 Phase Battery Cabinet 932796
Page 15
Specifications 7-1 Dimensions and Floor Loading Battery Cabinet Model BP240V99 BP240V120 BP240V1207C BP240V150 BP240V1507C BP480V55 BP480V78 BP480V103 BP480V140 BP348V55 BP348V78 BP348V103 BP348V150 Shelves 3 3 3 3 3 3 4 4 4 4 4 4 4 Dimensions (Width x Depth x Height) 32 x 30 x 58 ...kg/m2) 413 lb/ft2 (2021 kg/m2) 7-2 Recommended Torque Battery Cabinet Model BP240V99 BP240V120 BP240V1207C BP240V150 BP240V1507C BP480V55 BP480V78 BP480V103 BP480V140 BP348V55 BP348V78 BP348V103 BP348V150 Individual Battery Unit Model UPS12-350MR UPS12-400MR UPS12-400MR UPS12-490MR UPS12-490MR UPS12-210MR ...
Specifications 7-1 Dimensions and Floor Loading Battery Cabinet Model BP240V99 BP240V120 BP240V1207C BP240V150 BP240V1507C BP480V55 BP480V78 BP480V103 BP480V140 BP348V55 BP348V78 BP348V103 BP348V150 Shelves 3 3 3 3 3 3 4 4 4 4 4 4 4 Dimensions (Width x Depth x Height) 32 x 30 x 58 ...kg/m2) 413 lb/ft2 (2021 kg/m2) 7-2 Recommended Torque Battery Cabinet Model BP240V99 BP240V120 BP240V1207C BP240V150 BP240V1507C BP480V55 BP480V78 BP480V103 BP480V140 BP348V55 BP348V78 BP348V103 BP348V150 Individual Battery Unit Model UPS12-350MR UPS12-400MR UPS12-400MR UPS12-490MR UPS12-490MR UPS12-210MR ...
Owner's Manual for 3 Phase Battery Cabinet 932796
Page 16
... SET FORTH ABOVE; Tripp Lite has a policy of regulatory compliance certifications and identification, your Tripp Lite product has been assigned a unique series number. On-site service plans are fully charged. Storage and Service Storage The battery cabinet must be turned on the battery cabinet to provide backup power to recharge. Service The battery cabinet is suitable, adequate or safe for this Warranty includes parts...
... SET FORTH ABOVE; Tripp Lite has a policy of regulatory compliance certifications and identification, your Tripp Lite product has been assigned a unique series number. On-site service plans are fully charged. Storage and Service Storage The battery cabinet must be turned on the battery cabinet to provide backup power to recharge. Service The battery cabinet is suitable, adequate or safe for this Warranty includes parts...