Owners Manual
Page 1
Owner's Manual SmartOnline® SVTX 3-Phase UPS Systems Models: SVT10KX, SVT20KX, SVT30KX (Series Number: AG-0149) (Series Number: AG-014A) (Series Number: AG-014B) Input: 220/230/240V (Ph-N), 380/400/415V (Ph-Ph), 30 4-Wire + PE Español p.33 • Français p.65 p.97 1111 W. 35th Street, Chicago, IL 60609 USA • www.tripplite.com/support Copyright © 2016 Tripp Lite. All rights reserved. 1
Owner's Manual SmartOnline® SVTX 3-Phase UPS Systems Models: SVT10KX, SVT20KX, SVT30KX (Series Number: AG-0149) (Series Number: AG-014A) (Series Number: AG-014B) Input: 220/230/240V (Ph-N), 380/400/415V (Ph-Ph), 30 4-Wire + PE Español p.33 • Français p.65 p.97 1111 W. 35th Street, Chicago, IL 60609 USA • www.tripplite.com/support Copyright © 2016 Tripp Lite. All rights reserved. 1
Owners Manual
Page 3
... otherwise damage sensitive electronic devices and minimizing system downtime from the attached load • Wide input voltage window - 1. Introduction Tripp Lite's SmartOnline SVTKX-Series Uninterruptible Power Supply (UPS) is ideally suited for protecting critical electrical equipment for: • IT infrastructure ...power factor - Available in the event of an extended mains failure to support critical loads continuously • Paralleling capability (SVT20KX and SVT30KX only) of up to the highest quality and performance standards and offer the following features: • True...
... otherwise damage sensitive electronic devices and minimizing system downtime from the attached load • Wide input voltage window - 1. Introduction Tripp Lite's SmartOnline SVTKX-Series Uninterruptible Power Supply (UPS) is ideally suited for protecting critical electrical equipment for: • IT infrastructure ...power factor - Available in the event of an extended mains failure to support critical loads continuously • Paralleling capability (SVT20KX and SVT30KX only) of up to the highest quality and performance standards and offer the following features: • True...
Owners Manual
Page 10
...external battery packs per UPS. 10 Breaker specification for parallel installation: Wiring Diagram of each UPS to a main output breaker. This UPS supports Tripp Lite external battery model BP240V135*. This will cause permanent damage to the entire system. 8) Refer to extend runtime. this section and proceed to ... instructions for your battery pack as they appear in accordance with the local codes/regulations and installed using the following wiring diagram for SVT20KX / SVT30KX is 300V, 63A. 6) Connect all units. 4) Connect the input wiring of each UPS must be equal to the...
...external battery packs per UPS. 10 Breaker specification for parallel installation: Wiring Diagram of each UPS to a main output breaker. This UPS supports Tripp Lite external battery model BP240V135*. This will cause permanent damage to the entire system. 8) Refer to extend runtime. this section and proceed to ... instructions for your battery pack as they appear in accordance with the local codes/regulations and installed using the following wiring diagram for SVT20KX / SVT30KX is 300V, 63A. 6) Connect all units. 4) Connect the input wiring of each UPS must be equal to the...
Owners Manual
Page 15
If the voltage difference after calibration remains greater than 1.5V, contact Tripp Lite Technical Support for further assistance. 2) Calibrate the output voltage measurement by configuring the output voltage calibration (refer to Program Codes 18, 19, and 20, ...UPS to Program Codes 15, 16 and 17, in section 4.7) in parallel and have the same configuration. 1) Turn on any unit. 4.5 Parallel UPS Operation (SVT20KX and SVT30KX) 4.5.1 Parallel system initial startup Before initial startup, first ensure all connections are connected correctly. 2) Turn on the output breaker of each UPS. 3) ...
If the voltage difference after calibration remains greater than 1.5V, contact Tripp Lite Technical Support for further assistance. 2) Calibrate the output voltage measurement by configuring the output voltage calibration (refer to Program Codes 18, 19, and 20, ...UPS to Program Codes 15, 16 and 17, in section 4.7) in parallel and have the same configuration. 1) Turn on any unit. 4.5 Parallel UPS Operation (SVT20KX and SVT30KX) 4.5.1 Parallel system initial startup Before initial startup, first ensure all connections are connected correctly. 2) Turn on the output breaker of each UPS. 3) ...