Installation Instructions
Page 4
... on the oven frame behind the top left side of 194°F (90°C). Thickness of this range is required. Tools needed Check local codes and consult gas supplier. Read and follow the instructions provided with local codes. This oven has been designed in a mobile...bit (for Mobile Home Construction and Safety, Title 24, HUD Part 280). See "Electrical Requirements" section. ■ Proper gas supply connection must conform with the current standards CAN/CSA-A240-latest edition, or with any tools listed here. In Canada, the installation of flooring may require longer screws...
... on the oven frame behind the top left side of 194°F (90°C). Thickness of this range is required. Tools needed Check local codes and consult gas supplier. Read and follow the instructions provided with local codes. This oven has been designed in a mobile...bit (for Mobile Home Construction and Safety, Title 24, HUD Part 280). See "Electrical Requirements" section. ■ Proper gas supply connection must conform with the current standards CAN/CSA-A240-latest edition, or with any tools listed here. In Canada, the installation of flooring may require longer screws...